Vertical Aerospace Finishes Its Bristol Battery Factory: Why Each Air Taxi May Need 20 Battery Packs

eVTOL.Travel Editorial

Vertical Aerospace's new Powertrain Centre in Bristol. Image: Vertical Aerospace.
On November 23, 2026, British eVTOL maker Vertical Aerospace announced that construction of its new Vertical Powertrain Centre in Bristol is complete. The 30,000 sq ft building sits next to the company's existing battery site, the Vertical Energy Centre, and will develop, test and produce the batteries and propulsion systems for Valo, the air taxi Vertical is taking through certification.
Equipment installation comes next. Vertical says operations will ramp up from 2027.
The facility at a glance
| Company | Vertical Aerospace (UK) |
| Announced | November 23, 2026 |
| Location | Bristol, England, beside the Vertical Energy Centre |
| Size | 30,000 sq ft (the existing Energy Centre is 15,000 sq ft) |
| What it does | Battery, power electronics and propulsion development, testing and production |
| Battery output | Expected to rise by up to three times over time |
| For which aircraft | Valo certification aircraft and early commercial production, plus Vertical's hybrid-electric programme |
| Operations | Ramp up from 2027 |
| Jobs and investment | Not disclosed |
The number that matters: 20 battery packs per aircraft
The most interesting detail is not the building. Vertical says each aircraft is expected to need about 20 battery packs over its operating life, depending on how it is flown and how the batteries perform.
That tells you two things.
For the company, batteries are a recurring business. An airline or operator that buys a Valo will keep buying battery packs for as long as it flies. Richard Moore, Vertical's VP of Powertrain, said the centre creates revenue across the life of each aircraft, and that Vertical sees longer-term potential to supply its battery and powertrain know-how beyond its own aircraft.
For passengers, batteries are a running cost. Air taxi batteries work hard. They deliver very high power at takeoff and landing and are charged quickly many times a day, so they wear out far sooner than the aircraft itself. Replacement packs will be part of the cost of every seat. That is why Vertical also plans to develop battery recycling, reuse and remanufacturing at the new centre: lower battery cost over time is one of the main routes to lower fares.
Where Vertical stands
- Batteries in-house since 2023. The Vertical Energy Centre opened in 2023 and has built the batteries for Vertical's piloted flight testing since 2024. Earlier in 2026 it produced the first all-electric Valo battery on an upgraded line.
- A hybrid version in testing. Vertical has begun testing its next-generation hybrid-electric propulsion system on a dedicated rig at Cotswold Airport. Hybrid power is how makers such as Ascendance aim for much longer range.
- Assembly site open, factory still to be named. An Aircraft Assembly Centre opened at Cotswold Airport in September 2026, and Vertical says it will announce the location of its first full-scale production site before the end of 2026.
- Not certified yet. Valo still has to complete certification before it can carry paying passengers. For the wider picture, see which eVTOLs are certified so far.
Why travelers should care
Factories are less exciting than first flights, but they decide whether an air taxi service is a demonstration or a business. An operator cannot run daily flights without a steady supply of certified battery packs. Vertical building that supply in Britain is a real step toward air taxi services in the UK and for the airlines that have placed pre-orders. It is not a launch date, and no Valo flights are on sale.
Get ahead of the first flights
We track every eVTOL launch and every personal eVTOL you can order, and we tell you honestly what can be booked or bought today. Read our guide to buying a personal eVTOL, compare aircraft, or contact us.
We are not the operator. We are the team that gets you there.
Sources: eVTOL Insights: Vertical Aerospace Completes Construction of Bristol Powertrain Facility, Nov 23, 2026 · Urban Air Mobility News: Vertical Aerospace completes construction of its powertrain engineering centre, Nov 23, 2026
Get the eVTOL.Travel brief
Where you can actually fly an eVTOL, aircraft you can buy, and the news that matters. About one email a week.
No spam. Unsubscribe with one click.
Sources: Information sourced from official company announcements, FAA publications, SEC filings, and verified industry reports. For corrections, contact us.


Written by
eVTOL.Travel Editorial
Contributor at eVTOL.Travel — covering electric vertical takeoff and landing aircraft, vertiports, and the launch of urban air mobility worldwide.
Continue reading

eVTOL Industry Update: Archer × Starlink × NVIDIA, Honda First Flight, and Vertical Aerospace Earnings
Major developments shaping the future of air taxis: Archer Aviation partners with SpaceX Starlink and NVIDIA for AI-powered flight, achieves 100% FAA Means of Compliance, Honda prepares for its first full-scale eVTOL flight, and Vertical Aerospace announces its FY 2025 earnings date.

A Faulty Router Grounded US Flights for Five Hours. Is Air Traffic Control Ready for Air Taxis?
On November 13, 2026, one misbehaving router forced the FAA to halt flights across the United States for nearly five hours. Air taxis planned for 2027 will depend on the same air traffic control network. Here is what happened, what United's CEO has said about air taxis near airports, and what it means for launch dates.

South Korea's First Home-Grown Air Taxi Heads for Certification: Sambo Motors B-34 Targets 2032
Korean auto-parts maker Sambo Motors Group is starting type certification for its own three-seat eVTOL, the B-34, with Korea's transport ministry at the end of November 2026. It targets approval in 2032. Here is what the aircraft is, the timeline, and what it means for air taxis in Korea.
Ready to explore the future of air travel?
Discover how eVTOL technology is revolutionizing urban mobility and plan your own aerial journey.